Project Overview

This project required the design and fabrication of two maintenance platforms to be used at Garden Island in WA by the ASC. 

Work included a full design review, update and safety initiatives whilst supporting ASC’s unique requirements. Design and review updates were done in accordance with ER-995.

Other work included fabrication, blasting and painting, FRP grating and treads, handrails with safety chain, and fire retardant protective netting (to prevent items falling from the howdah which is 15-20 metres above the ground when installed).

Prior to arranging transport to WA, we conducted a pre-delivery trial assembly.  Full MDR, NDT and QA documentation were required for this project, which was completed on time and on budget.

Client
Australian Submarine Corp (ASC)
Location
Henderson, WA