Project Overview:

This project involved the fabrication and installation of approximately 65 metres of throw screens to both sides of Bridge 12. The job included 3D site scanning of the bridge and concrete parapets to ensure the correct alignment between the cast-in ferrules and the new hot dip galvanised posts. 6mm thick mild steel perforated screens had to be fabricated and installed between the posts, so perfect alignment of the posts was critical. We were able to use our recently acquired crane truck to assist with the installation and ensure no damage was done to the powder coated finish.

Client
LR & M Construction / DPTI
Location
Bolivar, SA