This significant upgrade to Flinders Port Holdings’ Berth 6 extended the container terminal wharf by 135 metres and supported increased berth capacity, improved cargo handling efficiency, and strengthened the terminal’s role in global trade.
Williams Metal Fabrications’ team was responsible for the manufacture and delivery of the temporary platform frames that enable safe and efficient pile driving during construction.


