Project Overview:

This project was part of the state-wide Regional Bridges Project for McConnell Dowell/DPTI and a turn-key project for ID Fabrication, who gave us the opportunity to work alongside them and manufacture/install the structural steel for the bridge widening and strengthening at Rocky River Bridge. The job included onsite welding, installation of new horizontal and inclined strengthening struts and new traffic barriers made to current DPTI specifications. Point Cloud Survey and 3D modelling made fabrication and installation much easier as we were tying new steel onto an older, pre-existing structure.

Client
ID Fabrication
Location
Crystal Brook, SA