Project Overview
Williams Metal Fabrications was contracted to fabricate and install the mild steel pedestrian bridge railing on this project. This included the 3D site scanning of the precast concrete bridge and cast-in ferrules to ensure correct alignment of the railing posts. The structure was powder coated to provide a long-lasting surface protection and was completed on schedule and under budget.